April 1, 2024 08:00

LA VOZ DE TARIJA: ENDE: Bolivia advances in its second line of electric transmission in extra high tension with export sights The construction of the “transmission line in 500 kilovolts (kV) Carrasco – the Associated gaps and substations ”, the second line of electric transmission in extra high voltage of Bolivia, reports 77% advance, the […]

LA VOZ DE TARIJA: ENDE: Bolivia advances in its second line of electric transmission in extra high tension with export sights
The construction of the “transmission line in 500 kilovolts (kV) Carrasco – the Associated gaps and substations ”, the second line of electric transmission in extra high voltage of Bolivia, reports 77% advance, the National Electricity Company (Ende Corporation) reported.